Kehl II biomass CHP plant with fuel conveyor and stack
REFERENCESGermany / 2011Completed

Kehl Germany

Biomass CHP plant with process steam for a paper mill

Explore the plantTechnical data
GermanyProject year 2011Commissioning 2011

The Kehl II biomass CHP plant generates electricity and supplies the turbine exhaust steam as process steam to a neighbouring paper mill.

19.91 MW (gross)

Thermal input

23 t/h

Steam output

just under 3 MW

Electrical output

Challenge

At the Rhine port in Kehl, a combined heat and power plant was to use waste wood of categories A I and A II as well as fresh wood and supply a paper mill with steam.

Solution

The fuel is tipped at enclosed truck unloading points, freed of oversized pieces and ferrous and non-ferrous metals, and stored in two silos of around 3,000 m³ each. A reciprocating grate firing supplies the boiler with 23 t/h of live steam at 78 bar and 470 °C. The flue gases are cleaned by dry sorption with hydrated lime and hearth furnace coke.

Result

Since March 2011, the plant has generated just under 3 MW of electricity; the back-pressure steam at 7.5 bar goes to the paper mill. The boiler efficiency is 89%.

Technology

Technology

Kehl, Germany

Fuel
Waste wood A I–A II, fresh wood
Firing system
Reciprocating grate
Thermal input
19.91 MW (gross)
Steam output
23 t/h
Live steam
78 bar / 470 °C
Back pressure
7.5 bar (a) at approx. 180 °C
Electrical output
just under 3 MW
Boiler efficiency
89 %
Flue gas cleaning
Dry sorption with hydrated lime and hearth furnace coke
Commissioning
March 2011