Sectional drawing of one of the two boiler plants in Wismar
REFERENCESGermany / 2022Completed

Wismar Germany

Biomass CHP plant with two boilers and one turbine

Explore the plantTechnical data
GermanyProject year 2022Commissioning 2022

In Wismar, two Kablitz boiler plants jointly supply a steam turbine with up to 17 MW of electrical output and deliver up to 30 MW of district heating.

2 × 32.94 MW (65.88 MW)

Thermal input

2 × 37.15 t/h (74.3 t/h)

Steam output

max. 17 MW

Electrical output

Challenge

Bark and untreated biomass were to be used around the clock for electricity and district heating in Wismar.

Solution

Two reciprocating grate firings of 32.94 MW each supply two boilers with a combined 74.3 t/h of steam at 68 bar and 465 °C. Kablitz supplied the plant from the intermediate fuel bunker to the stack – including the turbine, heating condenser and flue gas cleaning.

Result

Since 2022, the plant has been running around the clock; it is equipped for 72 hours of operation without permanent supervision according to TRD 604.

Technology

Technology

Wismar, Germany

Fuel
Bark, biomass
Firing system
2 × reciprocating grate
Thermal input
2 × 32.94 MW (65.88 MW)
Steam output
2 × 37.15 t/h (74.3 t/h)
Live steam
68 bar (a) / 465 °C
Electrical output
max. 17 MW
Heat output
max. 30 MW
Commissioning
2022