Kablitz Logo
← All projects
Aerial view of the Munkedal boiler plant
REFERENCESSweden / 2021Completed

Munkedal Sweden

Saturated steam boiler for a paper mill

Explore the plantTechnical data
SwedenProject year 2021Commissioning 2021

In Munkedal, a Kablitz boiler plant generates saturated steam for a paper mill from solid recovered fuels and waste wood.

33.3 MW

Thermal input

46 t/h saturated steam

Steam output

Challenge

The paper machine needs steam without interruption – even during a paper break, when steam demand changes abruptly.

Process flow diagram of the Munkedal boiler plant
Technical drawing from the Kablitz project description

Solution

A reciprocating grate with a thermal input of 33.3 MW supplies a boiler for 46 t/h of saturated steam at 24 bar and 223 °C. A 16 MW load burner and a steam accumulator absorb load jumps. The flue gases are cleaned by dry sorption with hydrated lime and hearth furnace coke.

Site plan of the Munkedal boiler plant
Technical drawing from the Kablitz project description

Result

Since 2021/2022, the plant has supplied the paper mill with saturated steam at a rated output of 30 MW and a peak output of up to 33 MW.

Technology

Technology

Munkedal, Sweden

Fuel
Solid recovered fuels (SRF), waste wood
Firing system
Reciprocating grate
Thermal input
33.3 MW
Boiler output
30 MW (peak 33 MW)
Steam output
46 t/h saturated steam
Saturated steam
24 bar (a) / 223 °C
Load burner
16 MW
Flue gas cleaning
Dry sorption with hydrated lime and hearth furnace coke
Commissioning
2021/2022
Kablitz · Since 1901

Discuss a similar project

Contact
Aerial view of the biomass CHP plant in Dollbergen

Next project / 2020

Dollbergen, Germany

Germany