Biomass CHP plant supplying process steam to a paper mill

Explore the plantTechnical data
GermanyProject year 2022Commissioning 2022

With a thermal input of around 88 MW, the CHP plant in Hürth supplies a paper mill with process steam and generates up to 20 MW of electricity.

87.5 MW

Thermal input

97 t/h

Steam output

max. 20 MW

Electrical output

Challenge

On the premises of a paper mill in Hürth-Knapsack, up to 370,000 t of fuel per year were to be used: fresh wood and green waste, plus a share of paper sludge, waste wood A I–A III and solid recovered fuels – all year round, 8,760 hours.

Sectional drawing of the firing system and boiler in Hürth
Technical drawing from the Kablitz project description

Solution

A reciprocating grate firing with 87.5 MW supplies a boiler with 97 t/h of steam at 81 bar and 490 °C. The fuel is delivered by truck to a storage hall with grab cranes; downstream flue gas cleaning is designed for the limits of the 17th BImSchV.

Result

The plant supplies either up to 20 MW of electricity or up to 50 t/h of process steam to the paper mill.

Technology

Technology

Hürth, Germany

Fuel
Fresh wood, green waste, paper sludge, waste wood A I–A III, SRF
Fuel quantity
up to 370,000 t/year
Firing system
Reciprocating grate
Thermal input
87.5 MW
Boiler output
77.25 MW
Steam output
97 t/h
Live steam
81 bar (a) / 490 °C
Electrical output
max. 20 MW
Process steam
max. 50 t/h
Permit
17. BImSchV
Commissioning
2022